BoQ from the building
DATE
:
October 20, 2018
PROJECT
LOCATION
OWNER
:
:
:
Proposed Three Storey Residential Building
SUBJECT
:
Bill of Materials
ITEM
PARTICULARS
ITEM A-
TOTAL ITEM A
General Requirements
Mobilization
Demobilization
Temporary Facilities
Village Bonds
Design/Shop Drawings/As-Built Drawings
Equipment
Site Management
ITEM A
1
2
3
4
5
6
TOTAL ITEM A
Earthworks
ITEM B
1
2
3
TOTAL ITEM B
Concreting + Reinforcement Steel Works + Formworks
Concrete
Formworks
Steel Reinforcement
ITEM C
1
Masonry Works
ground floor
100mm chb wall
150mm chb wall
1st floor
100mm chb wall
150mm chb wall
3rd floor
100mm chb wall
150mm chb wall
plaster works
Amount:
PHP 5,350,445.29
LABOR COST
TOTAL LABOR COST
Mr. & Mrs. Raul Anonuevo
REL
2
3
4
TOTAL ITEM C
ITEM D
1
2
TOTAL ITEM D
ITEM E
1
TOTAL ITEM E
ITEM F
1
2
3
TOTAL ITEM F
ITEM G
1
2
3
TOTAL ITEM G
Project Layout and Staking
Excavation
Backfill And Compaction
Soil Poisoning
Gravel Bedding
Lean Concrete
UNIT
lot
lot
lot
lot
lot
lot
lot
QTY.
MATL UNIT COST
TOTAL MATL COST
-
TOTAL COST
%
30,-%
10,-%
15,-%
0.000%
0.000%
15,-%
30,-%
100,-%
sq.m.
cu.m.
cu.m.
sq.m.
cu.m.
cu.m.
-
-,120.00
7,-,-,000.28
4,-,-,113.78
-
35,-,-,024.25
7,058.70
3,757.05
3,-,549.00
42,-,-,-,058.98
8,-,-,662.78
cu.m
sq.m.
kgs
-,504.04
3,-
315,-,-,773.41
1,066,757.50
2,-
232,-,-,-,470.38
548,-,-,813.79
1,622,227.88
sqm
sqm
-
-
37,-,417.83
-
18,-,717.60
55,-%
156,-%
sqm
sqm
-
-
34,-,063.81
-
17,-,674.00
51,-%
113,-%
sqm
sqm
sqm
-
-
17,-,-,-,097.69
-
-,-,-,759.92
1,-
110,-,-,439.47
-
26,-,-,082.00
136,-%
84,-%
221,-%
33,-%
33,-%
18,-,-,-,857.61
0.791%
1.234%
1.048%
0.338%
0.158%
0.462%
4.031%
10.252%
6.521%
13.547%
30.319%
0.351%
2.507%
3.974%
13.884%
Roofing Works
steel framing
roofing works
sqm
sqm
-
Waterproofing Works
deck, toilets, pool
sqm
78.98
320.00
25,-,273.60
110.00
8,687.80
8,687.80
Painting Works
wall area
ceiling area
fire wall
sqm
sqm
sqm
1,-
-
192,-,-,-,284.80
-
143,-,-,-,980.00
336,-,-,-,092.00
6.282%
1.031%
0.800%
8.113%
Tile Works
ground floor
first floor
second floor
sqm
sqm
sqm
-
1,004.16
1,004.16
1,004.16
146,-,-,-,803.69
-
16,-,-,-,838.52
162,-,-,-,642.21
3.035%
2.403%
2.293%
7.731%
ITEM H
1
2
TOTAL ITEM H
Ceiling / Dry Wall Works
ceiling works
dry wall
ITEM I
1
Doors / Windows
Doors
0.90 x 2.10m single leaf panel (modern)
0.90 x 2.10m single leaf panel (wooden)
0.80 x 2.10m panel door (wooden)
0.60 x 2.10m PVC flush type door
0.60 x 2.10m PVC flush type door (custom)
0.90 x 2.10m double leaf panel (wooden)
0.90 x 2.10m single leaf metal door
2.80 x 1.50m double leaf metal door
5.65 x 2.10m cordion metal door
0.8 x 2.10m frameless glass door
4.85 x 2.10m frameless glass panel
Accessories and Hardwares
Windows
1.60 x 1.20m sliding glass window
2.40 x 1.20m sliding glass window
1.60 x 1.00m sliding glass window
0.80 x 1.20m awning glass window
0.52 x 1.20m awning glass window
0.60x0.60m awning glass window
1.60 x 0.60m sliding glass window
Others
2
sqm
sqm
-
1,400.00
1,400.00
277,-,-,782.00
55,-,-,956.40
set
set
set
set
set
set
set
set
set
set
set
set
-
5,500.00
4,000.00
4,000.00
1,500.00
1,500.00
4,000.00
5,-,-,-,-,000.00
2,500.00
5,500.00
8,-,000.00
7,500.00
1,-,-,-,-,-,-,-,000.00
1,100.00
1,600.00
5,600.00
1,-,200.00
2,200.00
2,250.00
4,000.00
2,340.00
6,-,000.00
6,600.00
9,-,600.00
9,000.00
1,-,-,-,-,-,-,-,000.00
0.123%
0.179%
0.628%
0.168%
0.034%
0.359%
0.247%
0.252%
0.449%
0.262%
0.673%
1.121%
set
set
set
set
set
set
set
-
8,-,000.00
8,000.00
6,000.00
6,000.00
6,000.00
7,-,000.00
64,-,000.00
8,000.00
6,000.00
6,-,000.00
7,-,-,450.00
6,400.00
2,-,-,-,590.00
70,-,000.00
8,800.00
6,600.00
6,-,400.00
7,-,-,040.00
1.316%
0.411%
0.164%
0.123%
0.123%
0.493%
0.144%
0.206%
7.477%
m
set
-
1,-,000.00
20,-,000.00
2,062.50
3,000.00
set
set
set
set
set
sqm
pcs
-
18,-,-,-,000.00
8,000.00
1,-,293.00
5,000.00
18,-,-,-,-,-,-,-,-,918.00
1,800.00
1,800.00
2,000.00
1,700.00
2,400.00
1,000.00
2,858.60
1,-,621.10
19,-,-,-,-,-,-,-,-,539.10
0.370%
0.370%
0.411%
0.350%
0.493%
0.206%
0.321%
0.206%
3.767%
pcs
pcs
pcs
set
pcs
-
-,-,500.00
29,-,-,-,-,-,391.97
5,860.86
4,529.45
2,-,323.30
6,-,078.39
35,-,-,-,-,-,470.36
0.657%
0.508%
0.276%
2.391%
0.774%
4.607%
pcs
100.00
230.16
23,015.94
4,603.19
pcs
pcs
pcs
pcs
m
-
3,-,-
6,-,458.45
5,-,706.40
2,300.00
1,334.00
2,691.69
1,031.55
3,-
pcs
pcs
pcs
pcs
pcs
pcs
pcs
-
-,450.00
-,727.05
6,-,-,634.05
3,-,076.74
-,145.41
1,323.65
7,145.41
2,-,615.35
TOTAL ITEM I
ITEM J
1
2
3
4
5
6
7
TOTAL ITEM J
ITEM K
1
2
3
4
5
TOTAL ITEM K
ITEM L
1
2
3
4
5
6
7
8
TOTAL ITEM L
Miscellaneous items
handrailings
trellis
kitchen cabinets
1.42 x 0.90 Kitchen Cabinet
0.75 x 0.90 Kitchen Cabinet
2.45 x 0.90m Kitchen Cabinet
1.8 x 1.15 Bar Counter
closet
stone cladding
concrete décors (baluster, canopy, mouldings)
toilet glass panel
Plumbing Works
house drain
vent
water supply
fixtures & accessories
septic tank
Electrical Works
wiring devices and switch
lighting and luminaries
decorative chandelier
downlight lighting
sportlight fixture
incandecent bulb
cove light
telecom & data
telephone cable outlet
tv cable outlet
electrical conduit and fitting
electrical box and covers
wires
circuit breaker
panel board
332,-%
111,-%
443,-%
22,-%
33,-%
27,-%
0.000%
8,-%
16,-%
6,-%
23,-%
2,-%
0.000%-%-%
42,-%
7,-%
42,-%
12,-%
4,-%
195,-%
ITEM M
1
2
3
4
Mechanical
mechanical allowancce (optional)
chemical feeder
water pump
pool accessories
hydromassage
lighting
TOTAL ITEM M
SubTotal
GRAND TOTAL
pc
pc
1.00
1.00
5,-,000.00
set
set
1.00
1.00
18,000.00
5,000.00
30,000.00
5,-,000.00
6,000.00
18,000.00
5,-,000.00
6,000.00
3,902,389.23
1,405,228.86
36,000.00
5,-,-,000.00
5,-,000.00
0.673%
0.093%
0.280%
0.000%
0.336%
0.093%
1.477%
5,350,-%
PREPARED BY:
MARIO S. CASERES, JR.
APPROVED BY:
MR. & MRS. RAUL ANONUEVO