BHARGAVA TEJA SRIKANTAM, M.Eng, EIT
#400 - Ave NW, Edmonton, AB - T5B0J1| - |-URL: https://ca.linkedin.com/in/bhargava-teja-srikantam-46aa296a
Education
MASTER OF ENGINEERING | SEP 2014 – JUN 2016 | UNIVERSITY OF TORONTO, CANADA
· Major: INDUSTRIAL ENGINEERING (GPA: 3.8/4 )
· Related coursework: Statistical Quality Assurance, Engineering Maintenance Management, Principles of
Measurement, Project Management, Financial Management, Operations & production Management.
BACHELOR OF ENGINEERING | JUN 2010 – MAY 2014 | ANNA UNIVERSITY, INDIA
· Major: MECHANICAL ENGINEERING (GPA : 8.2/10 )
· Related coursework: Supply Chain Management, Quality Control, Operations Research, Manufacturing
Technology, Cost Estimation & Planning, Design of Machine elements, Theory of machines.
Skills
· Supply chain management, Project Management, SPC, FMEA, TQM, JIT, Kaizen, Kanban, Minitab, Simul8, Oracle,
Maintenance management (PERDEC), R Studio, MS – Office, MS -Access, MS- Visio, Basic SQL, MS – Project, GD & T,
Value stream mapping, Auto CAD, Solid Works, Catia, Lean Six sigma
Work Experience
INDUSTRIAL ENGINEER - EIT |STANTEC CONSULTING INC| MAR 2018 - PRESENT
· Designed different Industrial facilities like food manufacturing, warehouses, maintenance using Industrial
Engineering, lean tools and techniques with safety as an important factor.
· Supported projects in terms of design, preparing tender documents, procurement, construction, analysis,
reporting.
· Planned & implemented processes, layout of facility by coordinating with clients, vendors, contractors on a
regular basis. Coordinated with project managers, other discipline leads in designing facilities.
· Achieved 95% results which are within the budget and also implemented different cost saving initiatives.
· Deployed analysis, simulation models for the projects during the functional programming phases.
BUSINESS SYSTEMS LEADER |QUALITROL CORP, TORONTO| MAY 2017 – MAR 2018
·
·
·
·
Continuous process improvements for new and existing products using lean
Planning, facilitation & implementation of kaizens activities, train associates on lean tools & techniques
Achieved 30% improvements in performed kaizens and 80% sustainment on the same
Improved financial processes using transactional process improvement tool and achieved sustaining results.
INDUSTRIAL ENGINEER | EGAN VISUALS INC, TORONTO| OCT 2016 – MAY 2017
· Continuous Process Improvements, Cost & labor analysis
· Planning & Procurement of equipment to enhance productivity, Improved productivity by 20 %
· Engineering time studies, Capacity analysis, production trial runs & Line balancing
· Plant Layout analysis & optimizations using AutoCAD, lean six sigma
JUNIOR INDUSTRIAL ENGINEER | OLDCASTLE BUILDING ENVELOPE, TORONTO| MAY 2016 – SEP 2016
· Designed ware house layout, Improved area utilization by 15%
· Analyzed requirement of warehouse equipment, associated with the procurement process for the same.
· Planning & Procurement of material requirements – developed JIT criteria
· Deployed Lean Manufacturing Strategies
· Developed maintenance strategies, Procured Computerized maintenance management software
GRADUATE RESEARCH ASSISTANT | UNIVERSITY OF TORONTO | SEP 2014 – DEC 2015
· Developed Process Improvements proposal to reduce defects
· Analyzed data collected using Minitab
· Utilized Root Cause Analysis, FMEA, SPC, Lean Six Sigma tools
· Identified the root cause, implemented potential remedies and reduced defects by 5%
· Deployed forecasted data under discrete event simulation using R studio
PRODUCTION ENGINEERING INTERN | RENAULT NISSAN AUTOMOTIVE, INDIA | APR 2013 – AUG 2013
· Worked in departments of Body Production, Engine Assembly and Assembly
· Deployed kaizens for smooth flow of production in new engine assembly unit
· Performed Engineering & Time Studies for Process Optimization, deployed standard operational procedures.
· Process Improvements resulted in productivity increase from 2 to 5 units per hour
PROJECT WORK EXPERIENCES
SUPPLY CHAIN OF ORGAN ALLOCATION AND SURVIVAL ANALYSIS MODEL | JUN 2013 – MAY 2014
· Developed an organ allocation model by discrete event simulation for India transplant scenario
· Estimated that the organ allocation efficiency increases by 10 % overall, simulated using Simul8
· Incorporated continuous improvement strategies to increases the efficiency of internal hospital supply chain
Certifications
·
·
·
·
GREEN BELT – LEAN SIX SIGMA | INSTITUTE OF INDUSTRIAL ENGINEERS | NOV 2015
YELLOW BELT – LEAN SIX SIGMA | GO LEAN SIX SIGMA | SEP 2015
PROJECT MANAGEMENT | EXPERT RATING | DEC 2015
[ SUPPLY CHAIN MANAGEMENT ] | APICS
· AUTO CAD 2D & 3D | COIMBATORE INSTITUTE OF TECHNOLOGY | APR 2012
Volunteering & Leadership Experience
· Served as Auditor for Technical symposium conducted by department of mechanical engineering , Coimbatore
institute of Technology
· Served as Liaison / Placement coordinator between Jun 2013 – May 2014 for department of mechanical
engineering , Coimbatore institute of Technology
Non Academic Experiences
· Worked as team member in Tim Hortons Canada ( Part time ) between Nov 2014 – Apr 2016
· Worked as sales associate for Bell Canada ( Part time) between Nov 2014 – Apr 2015
AWARDS
BEST STUDENT COORDINATOR | Dept. of Mechanical Engineering, Coimbatore Institute of Technology | Apr 2014
Page 2