Darwin Atendido

Darwin Atendido

$15/hr
IBwave Design Engineer and Ekahau Design Engineer
Reply rate:
-
Availability:
Hourly ($/hour)
Age:
37 years old
Location:
Manila, Metro Manila, Philippines
Experience:
11 years
DARWIN CLARK T. ATENDIDO Licensed Electronics and Communications Engineer iBwave Design Certified , Mist WiFi Certified, Fiplex DAS Certified --PROFILE  Eleven(11) years of solid experience in telecommunication industry as RF Design Engineer for WiFi, IBS-DAS,5G, WiMAX/LTE (4G Network), WCDMA(3G Network), GSM(2G Network),TETRA,Public Safety.  Experience in Indoor and Outdoor Coverage Design & Planning using IBWave and Atoll Software.  Knowledgeable in different Network Design, Planning and Optimization Software(IBWave, ATOLL, OPTIs-WiMAX, TEMS Investigation 13 and 15, NEMO Outdoor 7.5, Nemo Handy, Agilent Technologies, TEMS 10 Investigation, GENEX Probe, PHAROS DM, AutoCad 2018),and Post-Processing Softwares(,ACTIX Analyzer, MAPINFO Professional, PHAROS Analyzer, NEMO Analyzer) and Microsoft Office applications (MS Word, MS Excel, MS Power point, MS Access, MS Outlook).  Knowledgeable in different WiFi Equipments(Cisco Router, Aruba Switch, Site Audit and Survey Tools (Handheld GPS, compass, digital camera, crimper binoculars, and inclinometer). SUMMARY OF PROFESSIONAL WORKING EXPERIENCE COMPANY POSITION LOCATION VENDOR/OP ERATOR DURATION IBWave Design Engineer-Globe GoWiFi Project IBWave Design Engineer Ericssson Radio DOT System Project Pasig City, Philippines Smart Telecom IBWave Design Engineer -Smart IBSDAS Project GSM/WCDMA/LTE Makati, Philippines Globe Telecom Drive Test Manager – Detecon Network Optimization GSM/WCDMA/LTE 2G/3G Radio Network Optimization Engineer Pasig City, Philippines Huawei February 2014June 2014 Ericsson Field Optimization Engineer Drive Test Engineer- GSM/WCDMA Papua New Guinea Ericsson November 2013 January 2014 SMS Global Technologies Inc. RF Enginner and Post Processing Engineer - GSM/WCDMA Pasig City, Philippines Globe Telecom. Ericsson, Huawei,Nokia March 2012 October 2013 Phil-kor Ubins Co. Ltd. RF Optimization Engineer – WiMAX /GSM/WCDMA Pasig City, Philippines Huawei April 2009 February 2012 SMS Global Technologies Inc. MetroGlobal Services Inc. September 2014 Present September 2014 – Present SMS Global Technologies Inc. 3202D East Tower, PSE Center, Exchange Road, Ortigas Center, Pasig City, Metro Manila, Philippines WiFi Integration, Planning and Design Engineer - WiFi Networks GO WIFI GLOBE TELECOM PROJECT  Generation of High Level and Low Level Design using IBWave and Autocad.  Integrate Wifi Equipments(Cisco Router, Switch,Cambium,Ruckus)  Generation of BOM & BOQ  RF Access Point Location Survey for Go Wifi Establishments.  RF Transmission Survey for Go Wifi Establishments.  Supervise Sub-contractors for generation of Site Developmental Plan.  Generation of Nemo Handy Scripts for Go Wifi walktest. Radio Network Engineer – IBS-DAS(2G,3G,4G,5G) ERICSSON RADIO DOT SYSTEM PROJECT  Completion of Radio Dot System Network Design  Generation of BOM & BOQ  Generation of High Level and Low Level Design using IBWave and Autocad.  Support on Site Survey for Radio Dot System Establishments.  Support RF Transmission Survey for Radio Dot System Establishments.  Completion and timely submission of Technical Site Survey Report  Supervise Sub-contractors for generation of Site Developmental Plan.  Generation of Nemo Handy Scripts for Signal walktest. Radio Network Engineer – IBS-DAS(2G,3G,4G,5G) SMART TELECOM IBS-DAS PROJECT  Completion of IBS-DAS Network Design  Generation of BOM & BOQ  Generation of High Level and Low Level Design using IBWave and Autocad.  Support on Site Survey for IBS-DAS Establishments.  Support RF Transmission Survey for IBS-DAS Establishments.  Completion and timely submission of Technical Site Survey Report  Supervise Sub-contractors for generation of Site Developmental Plan.  Generation of Nemo Handy Scripts for Signal walktest. Drive Test Manager - 2G, 3G and 4G Networks DETECON NETWORK OPTIMIZATION- SMART TELECOM PROJECT  Managing Drive Test Teams to perform Drive Test on GSM, UMTS, and LTE Network.  Prepairing the Script for GSM, UMTS, and LTE Drive Test Scenarios using Nemo Outdoor 7.5, Nemo Handy and Nemo Invex 7.4.  Supervise Drive Test Team for Validation and Verification on field test.  Guiding the Drive Test Team for planning Drive Test Route for the cluster Verification.  Responsible for updating the Drive Test Status of Cluster to Detecon Managers. RF Engineer and Post-Processing Engineer - 2G, 2.5G and 3G Networks GLOBE TELECOM OUTSOURCE AND BENCHMARKING PROJECT- GLOBE TELECOM PROJECT  Analysis of KPI and provide Network Quality Index Report using Tableau Software.  Outage Monitoring of Alarm and Fault Reports using IBM Cognos Software.  Performed “In-Building Solutions” walk test and drive test benchmarking using NEMO Outdoor tool & AGILENT Technologies.  Performed HSPA+ stationary test/ broadband benchmarking using different softwares/applications (NetPerSec,Adobe Flash Player, Mozilla Firefox,Numion,Speedtest).  Run a sequence of data test and call simulation to validate the RF coverage in the location of Cellex equipment.  RF Analysis & report using NEMO Analyzer and ACTIX Analyzer. February 2014 - June 2014 MetroGlobal Services Inc. 2208 Antel Global Corporate Center,J.Vargas Ave.,Ortigas Center, Pasig City Radio Network Optimization Engineer- 2G and 3G Networks Globe Telecom NEMESIS OPTIMIZATION PROJECT  OSS KPI Monitoring, Analysis with recommended solution.  Performed Cluster Optimization using TEMS 14 Investigation, HUAWEI M2000, HUAWEI PRS.  Detailed analysis of drive test data using TEMS 14 investigation route analyzer/ACTIX Analyzer, identify and troubleshoot missing neighbors, IRAT Handover, pilot pollution areas, areas of no dominance, code plan problems, overshooting sites, parameter inconsistency etc. Suggest various changes like antenna azimuth, tilt (electrical and mechanical), height, type, CPICH power etc.  Give recommendation for Pre-Drive Test of Cluster and provide OSS KPI Analysis.  Detailed analysis of dropped calls, call setup failures etc November 2013 - January 2014 Ericsson Ericsson AB, Branch Office, Section 494 Lot 1, Kennedy Road, P.O. Box 660 Boroko, Gordons NCD, Port Moresby, Papua New Guinea Field Optimization Engineer/Team Lead Drive Test Engineer- 2G, 2.5G and 3G Networks DIGICEL OPTIMIZATION PROJECT PHASE 6  Performed Cluster Optimization and Single Site Verification using TEMS 15 Investigation.  Detailed analysis of drive test data using TEMS 15 investigation route analyzer/ACTIX Analyzer, identify and troubleshoot missing neighbors, IRAT Handover, pilot pollution areas, areas of no dominance, code plan problems, overshooting sites, parameter inconsistency etc. Suggest various changes like antenna azimuth, tilt (electrical and mechanical), height, type, CPICH power etc.  Pre& Post drive test of new on air sites and post processing of log files to generate coverage & Quality plots. Neighbor list tuning.  Single Site Verification including checking of Scrambling code, sector swap, tilts, soft HO between sectors etc.  Detailed analysis of dropped calls, call setup failures etc March 2012 - October 2013 SMS Global Technologies Inc. 3202D East Tower, PSE Center, Exchange Road, Ortigas Center, Pasig City, Metro Manila, Philippines RF Engineer and Post-processing Engineer - 2G, 2.5G and 3G Networks BENCHMARKING PROJECT- GLOBE TELECOM PROJECT  Plan Drive Routes.  Performed “In-Building Solutions” walk test and drive test benchmarking using NEMO Outdoor tool & AGILENT Technologies.  Performed HSPA+ stationary test/ broadband benchmarking using different softwares/applications (NetPerSec,Adobe Flash Player, Mozilla Firefox,Numion,Speedtest).  Run a sequence of data test and call simulation to validate the RF coverage in the location of Cellex equipment.  RF Analysis & report using NEMO Analyzer and ACTIX Analyzer. April 2009 - February 2012 Philkor Ubins Co. Ltd. No. 23 San Rafael St., Brgy. Kapitolyo, Pasig City, Metro Manila, Philippines Radio Network Optimization Engineer and Post-Processing Engineer - 4G network HUAWEI-GLOBE WiMAX PROJECT  Plan Drive Routes.  Performed Cluster Optimization and Single Site Verification using OPTis-WiMAX.  Performed antenna audit to assure the correct setup based on the RF design and parameters.  Make documentation report and sales map coverage for WiMAX Projects.  Conducts analysis for WiMAX coverage and KPI test using Qubicom Pharos, Innowireless OPTIs analyzer tools.  Monitoring KPI Analysis Daily Report. RNO and Post Process Engineer - 2G & 3G networks Globe Telecom Optimization for 2G & 3G complainants( HUAWEI Outsource )  Plan Drive Routes.  Performed optimization to dominant site serving the complainant location.  RF walk test/drive test inside/outside the complainant's house or office using TEMS 10 Investigation tool.  Performs stationary test/ broadband test for Globe-Myfi/Lamborghini complainant.  Analyze call and sms failures encountered during drive test/walk test and coordinate to Huawei/Globe personnel for instructions.  Coordinate to the rigger for instructions in antenna repanning/tilting.  Make documentation report and recommendation.  Monitoring KPI Analysis Daily Report.  RF Technical Support/Troubleshooting/Analysis. RF Engineer - 2G network HUAWEI-DMPI GSM PROJECT & HUAWEI-SDR PROJECT  To perform site survey & verify the suitability of sites from the RF point of view, site acquisition.  Performed RF drive test of new on air sites and post processing of log files to generate coverage & Quality plots. Neighbor list tuning.  Single site Verification including checking of Scrambling code, sector swap, tilts, soft HO between sectors etc.  Do reports for site survey(TSSR) and Single Site Verification Report.  Monitoring KPI Analysis Daily Report. ELIGIBILITY ELECTRONICS AND COMMUNICATIONS ENGINEERING (ECE) LICENSURE EXAMINATIONS Professional Regulation Commission - Board of Electronics and Communications Engineer Manila, Philippines Date Taken: November 2008 Remarks: Passed IBWAVE Level 1 CERTIFICATION PROGRAM Date Taken: May 2018 Remarks: Passed Fiplex Public Safety Centric DAS CERTIFICATION TRAINING Date Taken: August 2020 Remarks: Passed Mist WiFi CERTIFICATION PROGRAM Date Taken: May 2020 Remarks: Passed EDUCATION New Era University Central Avenue,Diliman, Quezon City, Philippines Bachelor of Science in Electronics and Communications Engineering (BS ECE) June 2003 - March 2008
Get your freelancer profile up and running. View the step by step guide to set up a freelancer profile so you can land your dream job.