CURRICULUM VITAE
NAME
MITHUN BHUNIA
ADDRESS
VILL + P.O.- DURGACHAK,
BLOCK - E, 104, HALDIA,
PURBA MEDINIPUR,
WEST BENGAL, INDIA.
PIN- 721602
PHONE
email
BORN
MARITAL
STATUS
- or-
-
INDIAN
MARRIED
OBJECTIVE
To contribute to your organisation’s success through
.
efficient use of my previous experience & skills.
PRESENT EXPERIENCE
DESIGNATION
RESPONSIBILITY
SENIOR
ASSOCIATE
ENGINEER
D.C.S. OPERATOR
[CTA UNIT]
COMMISSIONING
ASSOCIATE
ENGINEER
(5YRS)
ORGANISATION
MCC.PTA INDIA
CORP. PVT.LTD.
800,000 tones/year
DURATION-
TILL DATE
EXPERIENCE
FIELD OPERATOR
[CTA UNIT]
( 1YEAR 2 MONTHS-
MCC.PTA INDIA
To
CORP. PVT.LTD-
PREVIOUS EXPERIENCE
ASSOCIATE
ENGINEER
FIELD OPERATOR
[CTA UNIT]
( 1YEAR )
MCC.PTA INDIA
CORP. PVT.LTD.
OTHER EXPERIENCE
TECHNICIAN
IN
TESTING
DEPARTMENT
EXECUTION OF TEST OF
PLASTICS MATERIALS &
PRODUCTS AS PER INDIAN &
INTERNATIONAL STANDARDS.
-
To-
( 7 MONTHS )
CENTRAL INSTITUTE
OF PLASTICS
ENGINEERING &
TECHNOLOGY
-
to-
PROCESS DESCRIPTION
[
MCC.PTA INDIA CORP. PVT.LTD. ]
CTA UNIT
AIR COMPRESSOR
FEED
PREPARATION
2ND
OXIDATION
REACTOR
PX
REACTOR
CENTRIFUGAL
SEPARATOR
FLASH
DRYING
CTA
WASTE WATER
SOLVENT
HBr
SOLVENT
RECOVERY
DEHYDRATION
DISTILLATION
CATALYST
REGENERATION
PTA UNIT
H2
STEAM, HOT OIL
CTA
SLURRY
PREPARATION
PRE HEATER
REACTOR
(0.5% Pd/C)
WATER
HAC
CTA UNIT
CENTRIFUGAL
SEPARATION
FLITERING
SEPARATION
RESLURRY
WASTE
WATER
DRYING
PTA
MAIN REACTION [CTA]
COOH
CH3
+ 3O2
SIDE REACTION
+ 2H2O
Para-Xylene
Terephthalic acid
PTA REACTION
COOH
4CBA
+ 10.5 O2
8CO2 + 5H2O
CH3
CH3COOH + 2O2
2CO2 + 2H2O
COOH
+ 2H2
CHO
CH3
COOH
CH3
CRYSTALLIZATION
+ H2O
CH3
2CH3COOH
CH3COOCH3 + CO + H2O
TOOLS & TECHNOLOGY USED
DESIGN CAPACITY
DCS
CENTRIFUGAL
COMPRESSOR
STEAM TURBINES
OFF GAS EXPANDER
1ST OXIDATION
REACTOR
2nd OXIDATION
REACTOR
DECANTER
(HYBRID)
AZEOTROPIC
DISTILLATION
TOWER
PUMPS
PUMPS
AGITATORS
OTHER
EQUIPMENTS
• YOKOGAWA CENTUM 3000 DCS
• DISC. CAPACITY →
,
• DISC. PRESS →
POWER →
• TYPES OF STEAM USED [4.5S→91.6 Ton/h, 1.5S→98.3 Ton/h,
VS(0.7S) →152.2 Ton/h]
• CAPACITY →198,000 Nm³/h, • SUC.PRESS. → 1.28 MpaA • DISC. PRESS
→0.108 MpaA.
• DESIGN PRESS. →1.90 MpaG, • OPERATING PRESS →1.55 MpaG,
• DESIGN TEMP. →215°C, • OPERATING TEMP. →200°C,
• VOLUME→775m³.
• DESIGN PRESS. →1.70 MpaG, • OPERATING PRESS →1.230 MpaG,
• DESIGN TEMP. →210°C, • OPERATING TEMP. →198°C • VOLUME→110m³.
• FEED CAPACITY →135 Ton/h, • DESIGN PRESS. →1.62 MpaG,
• OPERATING PRESS →1.230~1.235 MpaG, • DESIGN TEMP. →215°C,
• OPERATING TEMP. →200°C • VOLUME→10m³.
• DESIGN TEMP. →
, • DESIGN PRESS. →0.18MpaG
•NO OF TRAYS →18 with 316L-SS PACKING,
• REBOILER STEAM FLOW →100 Ton/h.
• DECANTER FEED PUMP [ CAPACITY →500 m³/h,head →50m, POWER
→125KW]
• HAC PUMP [ CAPACITY →171 m³/h, HEAD →60m, POWER →45KW]
• HIGH PRESS.HAC PUMP [CAPACITY →270 m³/h, HEAD
→230m, POWER→275KW] ,ETC.
NaOH PUMP [CAPACITY→350lit/h, • DISC PRESS→1.54MpaG, •
POWER→1.54KW]
OXYNON PUMP [ CAPACITY→100lit/h,• DISC PRESS→0.4 MpaG,
•POWER→1.5 4KW ], ETC
•
• DECANTER
LUBE OIL UNIT, ETC ]
VACUUM PUMP FOR BELT FILTER
CAN PUMP FOR HIGH PRESSURE SEALING, ETC.
ST
•1 REACTOR [• POWER→1550KW, • SPEED→30~70rpm,]
• 2nd REACTOR [• POWER→90KW, • SPEED→60 rpm], ETC.
CAPACITY→125 Ton/h,
CAPACITY →125
Ton/h, # ROTARY VALVE CAPACITY →25 Ton/h, ETC
•HIGH PRESSURE ABSORBER [DESIGN PRESS→1.9MpaG, DESIGN TEMP.
→65°C]
• ATM. PRESSURE ABSORBER [DESIGN PRESS→5KpaG, DESIGN TEMP.
→100°C]
• BLOWERS [ DISC. CAPACITY → 1500 Nm³/h, • POWER →45KW]
• BELT FILTER [ FLOW RATE→6.4 m³/h, FILTRATE AREA → 6.4 m ]
• CRICKET FILTER[ FLOW RATE→40m³/h, FILTRATE AREA → 11 m ]
• IG PSA [DESIGN PRESS→1.0MpaG, DESIGN TEMP. →60°C,FLOW
RATE→1700Nm³/h],
ETC.
DUTIES & RESPONSIBILITIES
PRESENT EXPERIENCE
D.C.S. OPERATOR
[CTA UNIT]
( 5yrs )
I OPERATE THE MODERN AND SOPHISTICATED YOKOGAWA CENTUM 3000 DCS PANEL.
MOVE CONTROL SETTINGS TO MAKE NECESSARY ADJUSTMENTS ON EQUIPMENT,
UNITS AFFECTING SPEEDS OF CHEMICAL REACTIONS, QUALITY, OR YIELDS.
PARAMETERS HAVE TO OBSERVE & CONTROL ARE LEVEL, TEMPERATURE, PRESSURE,
FLOW, AMPERE, VIBRATION, PH, CONDUCTIVITY, ETC.
TO OBSERVE TREND, PANEL LIGHTS OR OTHER INDICATORS AND LISTEN FOR
WARNING ALARMS TO VERIFY CONFORMITY OF PROCESS CONDITIONS.
FAMILIAR IN PROCESS SAFETY [“INTER LOCKS” & “PRO SAFE SYSTEM”] SYSTEMS.
CONTROL OR OPERATE CHEMICAL PROCESSES OR SYSTEMS OF MACHINES, USING
PANEL BOARDS, CONTROL BOARDS OR SEMI-AUTOMATIC EQUIPMENT.
FOLLOW & OBSERVE SAMPLES RESULTS OF LABORATORY TEST CARRIED OUT ON
PRODUCTS, RAW MATERIALS AND OTHER CHEMICALS TO MONITOR PROCESSING
AND TO ENSURE THAT QUALITY & STANDARDS ARE MET.
CONFER WITH TECHNICAL AND SUPERVISORY PERSONNEL TO REPORT OR RESOLVE
CONDITIONS AFFECTING SAFETY, EFFICIENCY, OR PRODUCT QUALITY.
TO TAKE NECESSARY ACTION WHEN FOUND ANY ABNORMAL CONDITION THEN QUICK
REPORT TO SUPERVISOR AND IF NECESSARY IT IS INFORMED TO OUR MAINTENANCE
DEPARTMENT.
REGULATE OR SHUT DOWN EQUIPMENT DURING EMERGENCY SITUATIONS AS
DIRECTED BY SUPERVISORY PERSONNEL.
TO BE RESPONSIBLE FOR MONITORING THE EFFICIENT OPERATION OF THE
EQUIPMENT IN MY DESIGNED AREA &. AT THE END OF SHIFT I HAVE MADE SHIFT
REPORT TO THE INCOMING OPERATOR.
TO FOLLOW THE STANDARD SAFETY RULES AND REGULATION IN MY WORKING
PERIOD.
CONFIRM SAFETY TREATMENT AND CONTROL SAFETY DURING OPERATION
(INDIVIDUAL SAFETY, CONTRACT LABOR SAFETY).
PREVIOUS EXPERIENCE
FIELD OPERATOR
[CTA UNIT]
(2yrs)
TO BE FAMILIAR WITH PLANT EFD AND P&ID ENGINEERING DIAGRAM.
TO DO PLANT PATROLLING & REPORTING IN PUNCH REGISTER IF ANY ABNORMALITY THERE.
TO DO PLANT REGULAR JOBS.
TO TAKE SAMPLE FROM SPECIFIC SAMPLE POINT.
TO DO SAFETY TREATMENT BEFORE HANDING OVER TO MAINTENANCE & AFTER COMPLETION
TO
REMOVE THE SAFETY TREATMENT.
IMPART TRAINING TO JUNIORS.
TO BE CONSCIOUS OF SELF SAFETY IN DAILY JOBS.
TO DO TOOL BOX MEETING BEFORE ANY UNUSUAL, RISKY OR SPECIAL JOB.
TO HAVE KNOWLEDGE OF USING PROPER PPE FOR PROPER JOB.
TO TAKE CARE OF CONTRACT LABOR SAFETY.
TO WRITE HATTO HIYARI ABOUT ANY UNSAFE CONDITION.
TO DO KAIZEN (SMALL IMPROVEMENT).
TO DO 5S AFTER COMPLETION OF ANY JOB.
TO PARTICIPATE AS A QC TEAM MEMBER & FOLLOW QC LEADER S INSTRUCTION.
COMMISSIONING EXPERIENCE
I PERFORMED SOLO TEST RUN AND MECHANICAL RUN TEST ON EQUIPMENTS
DURING THIS PERIOD I PERFORMED START-UP AND SHUT-DOWN OPERATIONAL JOB IN
CTA UNIT.
AS A COMMISSIONING ENGINEER I PERFORMED,
•
STEAM BLOWING OF HP & LP STEAM LINES.
•
AIR BLOWING TO COMPRESSOR DISCHARGE LINES & GAS LINES.
•
HYDRO & PNEUMATIC TEST ON PROCESS LINES & EQUIPMENTS.
•
WATER FLUSHING OF VESSELS, PROCESS LINES, PUMPS, ETC.
•
OIL FLUSHING :- # LUBE OIL FLUSHING OF DECANTER OIL UNIT & D.V. UNIT
# LUBE OIL FLUSHING OF COMPRESSOR LUBE OIL UNIT
# HOT OIL FLUSHING OF TRACING LINES.
•
MECHANICAL COMPLETION CHECKING OF VARIOUS LINES WITH ISOMETRIC VIEWS
•
N2 SUBSTITUTION OF REACTORS, TOWERS, DIFFERENT VESSELS HEAT EXCHANGERS &
TANKS.
•
CONTROL VALVE LOPE CHECK, ETC.
EDUCATIONS & DEGREES
ACADEMIC
COURSE
BOARD /UNIVERSITY
SECONDARY
WEST BENGAL BOARD OF
SECONDARY EDUCATION
WEST BENGAL COUNCIL OF
HIGHER SECONDERY
EDUCATION
VIDYASAGAR UNIVERSITY
HIGHER
SECONDARY
GRADUATION
(B.Sc)
SCORED
57.4%
DURATION & YEAR OF
PASSING
1998 - 1999
44%
1999 - 2001
44%
2001 - 2005
75.4%
2005 - 2007
TECHNICAL
POST GRADUATE
DIPLOMA
IN
PLASTICS
PROCESSING
&
TESTING
CENTRAL INSTITUTE OF
PLASTICS ENGINEERING &
TECHNOLOGY
OTHERS
•
I HAD COMPLETED
TRAINING FROM
•
I HAD COMPLETED
•
ACHIEVEMENTS
TRAINING FROM
:DURING THE YEAR 2013 ~ 2014 I WAS
IN PLANT OPERATION.
FOR
•
LANGUAGES KNOWN
•
DECLARATION
:-
ENGLISH, HINDI, BENGALI.
:-
I here by declare that the particulars
furnished above are complete and correct to the best of my
knowledge and belief.
Place :- HALDIA
Mithun Bhunia